This difficult steep site saw the Evergreen Landcare team constructing 15 large swales and 2 large rain gardens as part of the engineered treatment of the storm water runoff. The construction required excavation to GPS coordinates, installation of pre-cast concrete weirs, the install of a low permeable clay liner and topsoil back fill with complete landscaping and riprap rocking.